Office Fit-Out Electrical
Complete electrical design and installation for office fit-outs including lighting, power distribution, data cabling, and emergency systems across East Sussex.

Office Fit-Out Electrical in Eastbourne
Whether you're creating a new office, refurbishing existing space, or converting to open-plan working, professional electrical design and installation is critical. D J Fox Electrical provides complete electrical fit-out services for office environments, integrating power distribution, modern lighting, data cabling, emergency systems, and smart building technology.
With over 15 years of commercial electrical expertise in East Sussex, we deliver professional office electrical installations meeting Building Regulations, health and safety requirements, and energy efficiency standards.
What We Provide
- Complete office electrical design and planning
- Power distribution and circuits design
- Lighting design and installation (LED, smart controls)
- Network and data cabling installation
- Emergency lighting and exit systems
- Fire alarm system integration
- Building management systems integration
- Energy-efficient HVAC system wiring
- Telephone and low-voltage systems
- Accessibility compliance (emergency systems)
- Testing and certification
- Project management and coordination
- Handover and staff training
Why Choose D J Fox Electrical?
- NICEIC Approved Contractor with office experience
- 15+ Years Commercial Fit-Out Experience
- Design from Building Regs to Commissioning
- Coordination with architects, contractors, and building management
- Energy-efficient systems reducing operational costs
- Minimal disruption to working environment
- 24/7 support for ongoing needs
- Fully insured and certified
Office Electrical Design
Modern office electrical design considers:
Workstations & Power Distribution
- Adequate sockets at workstations (typically 4-6 per desk)
- Underfloor or overhead distribution systems
- USB charging integrated into workstations
- Cable management systems
- Flexibility for reconfiguration
- Load distribution across circuits
Lighting Design
- LED lighting for efficiency and quality
- Layered lighting (ambient, task, accent)
- Daylight-responsive controls
- Occupancy sensors (movement-activated dimming)
- Colour temperature selection (cool for focus, warm for collaboration)
- Glare reduction and eye comfort
- Emergency lighting for safety
- Health and wellbeing considerations
Data & Network Cabling
- Cat6/Cat6a structured cabling
- WiFi access points for wireless coverage
- Network cabinets and patch panels
- Future-proofing for technology upgrades
- Proper cable management and pathways
- Testing and documentation
Environmental Control
- HVAC system electrical integration
- Heating and cooling distribution
- Air quality monitoring
- Humidity control (for sensitive equipment)
- Temperature zoning
Safety & Compliance
- Emergency lighting to all exits
- Fire alarm system integration
- Backup power for emergency systems
- Accessibility features for disabled users
- Security system integration
- Health and safety features
Common Office Fit-Out Scenarios
New Office Space in Existing Building:
- Power distribution from existing building supply
- New circuits and sockets for office layout
- Complete lighting system installation
- Data cabling to workstations
- Emergency systems coordination with building
- Integration with building management systems
Open-Plan Conversion:
- Remove internal walls and redistribute power
- New ceiling lighting design
- Flexible power and data distribution
- Acoustic lighting solutions (sound reduction)
- Collaborative zone electrical design
- Meeting room provision
Small Office Start-Up:
- Design efficient power distribution for startup team
- Modern lighting for productivity
- Network infrastructure for growth
- Flexible layout for future expansion
- Cost-effective solutions
Multi-Story Office Building:
- Three-phase distribution across floors
- Separate circuits per floor for load distribution
- Centralized electrical rooms
- Backbone data cabling
- Emergency systems throughout
- Building management system integration
Office Refurbishment:
- Upgrade existing electrical infrastructure
- Modern safety features (RCD protection)
- Energy-efficient LED lighting
- Enhanced data connectivity
- Accessibility upgrades
- Compliance with current Building Regulations
Lighting for Office Productivity
Research shows proper lighting impacts:
- Productivity - correct lighting increases focus and reduces fatigue
- Mood & Energy - appropriate colour temperature affects employee wellbeing
- Safety - proper illumination prevents accidents
- Energy Costs - LED and controls reduce consumption by 40-60%
- Health - circadian rhythm alignment (important for wellbeing)
Our lighting design considers:
- Task Lighting - focused light at workstations (300-500 lux)
- Ambient Lighting - general office illumination (300-400 lux)
- Accent Lighting - highlighting features, wayfinding
- Daylight Harvesting - sensors adjust artificial light based on natural daylight
- Circadian Lighting - adjusts colour temperature through day
- Accessibility - suitable for employees with visual impairments
Technology Integration
Modern office electrical installation includes:
Building Management Systems:
- Centralized control of lighting, heating, cooling
- Energy monitoring and optimization
- Automated reporting and alerts
- Remote access and adjustment
- Integration with occupancy sensors
Smart Lighting:
- Occupancy-based automatic switching
- Daylight-responsive dimming
- Colour temperature adjustments
- Scene controls for different activities
- Mobile app control options
- Integration with employee health apps
Network Infrastructure:
- Gigabit Ethernet throughout
- Wireless access points for coverage
- Guest network separation
- Network security systems
- Unified communications (VoIP) cabling
Access Control:
- Keycard or keypad entry to office areas
- Security integration
- Time-tracked access logs
- Emergency exit override
Office Fit-Out Installation Process
- Design Phase - Work with architects/designers to plan electrical infrastructure
- Specifications - Detailed electrical design drawings and equipment list
- Building Regulations - Submit designs for Building Control approval
- Procurement - Order all electrical equipment and materials
- Site Preparation - Prepare cable routes, equipment rooms, conduit systems
- First Fix - Install all cables, conduits, backboxes, and infrastructure
- Building Work - Coordinate with builders, plasterers, decorators
- Second Fix - Install lights, switches, sockets, equipment
- System Integration - Install control systems, networking, BMS
- Testing - Full electrical testing and verification
- Commissioning - Activate all systems and train occupants
- Handover - Provide documentation, warranties, ongoing support
Typical Office Fit-Out Costs
Small Office (100-200m²):
- Electrical design: £1,500-2,500
- Equipment & materials: £5,000-8,000
- Installation labour: £4,000-6,000
- Testing & certification: £500-800
- Total: £11,000-17,300
Medium Office (200-500m²):
- Design: £2,500-4,000
- Equipment & materials: £8,000-15,000
- Labour: £6,000-12,000
- Testing: £800-1,200
- Total: £17,300-32,200
Large Office (500m²+):
- Design: £4,000-8,000
- Equipment & materials: £15,000-30,000+
- Labour: £12,000-25,000+
- Testing: £1,200-2,000+
- Total: £32,200-65,000+
Costs vary based on building condition, complexity, and technology integration level.
Service Coverage
Available across Eastbourne, Brighton, Hastings, Lewes, Hailsham, and all surrounding East Sussex locations within a 25-mile radius.
Related Services
- Data & Network Cabling - structured network infrastructure
- LED Lighting Upgrade - modern energy-efficient lighting
- Emergency Lighting Testing - safety compliance
- Commercial Maintenance Contracts - ongoing support
- Three-Phase Installation - for larger facilities
Building Regulations Compliance
All office fit-outs comply with:
- Part B (Fire Safety) - emergency lighting, fire alarms
- Part E (Access to Buildings) - accessibility features
- Part F (Ventilation) - HVAC electrical integration
- Part G (Sanitation) - electrical services in facilities
- Part M (Access to Buildings) - disability accessibility
- Part P (Electrical Safety) - notifiable electrical work
We handle all Building Control submissions and inspections.
Energy Efficiency & Sustainability
Modern office electrical design reduces environmental impact:
- LED Lighting - 70-80% energy reduction vs traditional lighting
- Occupancy Sensors - 20-30% energy savings through automatic switching
- Daylight Harvesting - reduces artificial lighting needs
- Efficient HVAC - reduced heating/cooling loads through smart controls
- Power Factor Correction - reduces reactive power waste
- Renewable Integration - solar ready design, EV charging provision
- Building Rating Impact - improves BREEAM/EPC ratings
Typical energy savings from modern office electrical systems: 30-50% reduction in energy consumption.
Get a Free Consultation
Contact D J Fox Electrical for a free office fit-out electrical design consultation.
Phone: Call for project discussion Email: Submit project brief Online Form: Request consultation meeting Emergency: 24/7 support available
D J Fox Electrical Ltd NICEIC Approved Contractor Commercial Services Specialist Serving Eastbourne & East Sussex since 2009
Frequently Asked Questions
QHow long does an office fit-out typically take?
Design phase: 2-4 weeks. Construction phase: 3-8 weeks depending on size and complexity. Total project: 2-4 months typical.
QCan I work in the office during fit-out?
Typically no for major work. First fix (cable installation) requires building access. Second fix can sometimes be scheduled around working hours for minor work.
QWhat if the building is in a Grade I listed building?
Special considerations apply to listed buildings. We work with conservation officers and ensure electrical systems are sympathetic to historic features.
QHow much power do modern offices need?
Approximately 50-100W per workstation for computers and equipment. Total office power requirements vary but figure 15-20kW for 100-person office typical.
QShould I include smart building systems?
Increasingly yes. Smart systems reduce energy by 20-30%, improve comfort, and attract quality tenants/employees. ROI typically 3-5 years.
QWhat's the cost of future-proofing electrical infrastructure?
Adding 10-15% extra capacity for future technology adds minimal cost (2-3% to total budget) but provides significant flexibility.
Still have questions?
Call Us: 01323 123456Ready for Professional Office Fit-Out Electrical?
Contact D J Fox Electrical today for a free quote. Our expert team is ready to help with your office fit-out electrical needs.